Emeralda Marsh Conservation Area 5 Peat Removal Project
Updated on 3-27-2024
The Emeralda Marsh Conservation Area (EMCA) is made up of seven wetland marsh areas. Beginning in the 1940s, the marshes were drained, and the exposed muck soils were used for row-crop agriculture and cattle grazing. Due to these agricultural practices the exposed wetland soils oxidized and subsided. The soils within the conservation area were also subject to fertilizer and pesticide applications during farming operations.
The St. Johns River Water Management District acquired the EMCA properties through the Save our Rivers and Preservation 2000 programs in the 1990s. After years of restoration efforts to address high phosphorus levels in the water within the EMCA, five of the EMCA wetland areas have been connected either directly or indirectly to Lake Griffin. The District’s goal is to reconnect Area 5 as well. Some of the benefits to reconnecting to the lake include improved hydrology, and recreational access for fishing, hunting and wildlife viewing, including the District’s EMCA wildlife drive.
The peat soils present in EMCA Area 5 have naturally high phosphorus concentrations that were enriched by past agricultural practices. Compliance with the total maximum daily load (TMDL) limitations for Lake Griffin and the high phosphorus present in EMCA Area 5 prevent reconnection to Lake Griffin. Additionally, specific water/soil conditions present in EMCA Area 5 prevent the use of traditional phosphorus control methods such as alum. Because of this, the District has considered alternative methods for phosphorus control, including peat removal.
The peat removal project was initially considered in the 2012 District Lands Assessment Implementation Plan and approved by the District Governing Board in 2013. In 2016, the District entered into a lease agreement with Sun Gro Horticulture Excavation and Processing LLC, which was amended in 2021 to reflect a name change to LJF FPS, LLC, doing business as Florida Potting Soils (FPS), to remove the peat deposits in EMCA Area 5 that contain high phosphorus levels. The goal is to lower the phosphorus levels so that EMCA Area 5 can be reconnected to Lake Griffin while complying with the TMDL. The project supports the goal of restoration for the hydrological and ecological functions of the Ocklawaha River floodplain by minimizing the nutrient discharge from the property to Lake Griffin and the Ocklawaha River Basin, as outlined in the 2016 Land Management Plan for the EMCA, which includes information on the restoration and enhancement of the property.
Project timeline
2024
- Revised invasive plant management plan
- Fourth amendment sublet construction to Reliable Peat Company
2023
- Second amended and restated lease agreement was executed
- Peat removal operations ongoing
- Construction activities approximately 30% complete
2022
- DEP ERP General Permit re-issued for five years
- Internal levees under construction
- Peat removal and hauling began
2021
- District Governing Board approved lease amendment
- DEP 404 permit issued
2016
- Lease agreement signed
- District Governing Board approved a land management plan, which includes information on the restoration and enhancement of the property
- DEP ERP General Permit issued for five years
2013
- District Governing Board approved project bid selection and associated lease
2012
- District Governing Board approved the Lands Assessment Implementation Plan, which outlined peat removal strategy for EMCA Area 5 high phosphorus.
Frequently asked questions
What are the environmental benefits of the project?
The project supports the goal of restoration for the hydrological and ecological functions of the Ocklawaha River floodplain by minimizing the nutrient discharge from the property to Lake Griffin and the Ocklawaha River Basin.
What are the details of the lease?
The project is a multi-year lease to Florida Potting Soils (FPS) for removal of an estimated 3,400,00 cubic yards (C.Y.) of peat in Emeralda Marsh Area 5. This project is a part of the District’s overall restoration and public recreation objectives for the EMCA and removal of the specified nutrients are consistent with these objectives. The District is receiving a royalty of $0.25 for each cubic yard of peat material and/or other soil removed off the property as FPS intends to process and resell the excavated soil to consumers and other end users. See lease agreement and lease amendment.
Where does the royalty money go?
The District entered into a five-year revenue sharing agreement, with renewals in one-year increments, on Jan. 9, 2018, with Lake County to use a portion of the project revenues to fund aquatic resource conservation, restoration, or recreation improvement projects within Lake County. See Revenue sharing agreement between Lake County and District.
How will the site be managed during peat removal?
The removal of peat will be divided into five phases of operation. This is shown on FPS Emeralda Marsh proposed cell configurations. The start for peat removal from Phase 1 is anticipated in spring 2022.
Does the project have environmental permits?
The project has received general permits from the state of for an environmental resource permit (ERP) and a 404 permit from the Florida Department of Environmental Protection (DEP).
Are pesticide levels of concern?
DEP has determined that the removal and use of peat in the manner proposed complies with DEP rules or standards. See DEP peat removal and use clearance letter.
Will there be environmental monitoring during the peat removal?
Yes, FPS is required to conduct environmental monitoring and implement a Field sampling plan and Fish kill response plan.
When will the project finish?
A 10-year lease is in place until March 15, 2031, with two five-year extensions possible.
What will happen to the property when the project is complete?
The newly constructed levees will be removed, and the property will be restored and managed as a mixture of open water and wetland upon completion of each construction phase.
How are you keeping the public informed about the project?
The District has this webpage where we keep updated, timely information on the project as well as project history. We’ll continue to share project progress and updates through our District Facebook and Twitter pages, @sjrwmd. We are committed to keeping the public informed as the project progresses. For additional information or with questions, please send an email to Ombudsman@sjrwmd.com with the subject line EMCA Peat Removal.
Project-related documents
- Lease agreement
- Lease amendment
- Lease second amendment
- Lease fourth amendment
- DEP ERP general permit
- DEP 404 permit
- DEP peat removal and use clearance letter
- Revenue sharing agreement between District and Lake County
- 2012 Lands Assessment Implementation Plan
- 2016 Land Management Plan